“A Study on Detail Quantity & Cost Estimation of a Room in C.I.E.T, Raipur”
Authors Name:
Umesh Kumar Yadav
, Anurag Wahane
Author Reg. ID:
IJNRD_180304
Published Paper Id:
IJNRD2002026
Published In:
Volume 5 Issue 2, March-2020
Abstract:
- Many different items of work in a project depend on the quantities of the items, rate of items & cost of labour. In preparing an estimate the quantities of different items of wok are calculated by simple mensuration method and from these quantities abstracted cost is calculated which is actual cost at the present time. Accurate quantities of concrete and brick work can be calculated from layout drawings (given by competent authority). There are different methods for estimating of the residential, educational or other important buildings. It can be worked out using method- Long wall-short wall Method. In this paper, the quantity is worked out by manually and cost estimation of the building are carried out on the basis of latest PWD SOR (Schedule of Rates) 2015 and other market local traders quotations. The main objective of this paper is to carried out the actual cost of a single class room at present time.
Keywords:
Auto cad, LW-SW method, Quantity Estimation, SOR, PWD etc.
Cite Article:
"“A Study on Detail Quantity & Cost Estimation of a Room in C.I.E.T, Raipur”", International Journal of Novel Research and Development (www.ijnrd.org), ISSN:2456-4184, Vol.5, Issue 2, page no.260-271, March-2020, Available :http://www.ijnrd.org/papers/IJNRD2002026.pdf
Facebook Twitter Google+ Pinterest LinkedIn